Los Angeles, CA · Demolition Permit

Los Angeles Demolition Permit Requirements

Official Los Angeles demolition rules, checked against the city's own pages, plus 1,291 demolition permits issued in the last 12 months.

By the Home Permit Guide Editorial Team Last checked 2 official sources

Reviewed by Ken Pergeson, Permit Expediter & Code Compliance Consultant, Ventura County, CA ·

Short Answer

Yes

No building can be demolished in Los Angeles without a permit from the Department of Building and Safety (LADBS). A house and its accessory buildings on the same lot can share one permit, which needs a pre-inspection, a sewer cap permit and, for buildings over 45 years old, 30 days of public notice before it is issued.

Source: LADBS Information Bulletin P/BC 2026-039: Demolition of Buildings (linked under Sources below)

Los Angeles Demolition Permits at a Glance

Demolition permits, last 12 months
1,291
Median application to issue
90 days
Slowest quarter took at least
234 days
Whole-building demolitions
579

Of the 8 cities we track for demolition, Los Angeles ranks 7 of 8 by median wait. The median declared job value on these permits was $5,000.

Who Can Apply and Do the Work

LADBS issues demolition permits to a licensed wrecking contractor (C-21) or a general engineering contractor (Class A) with a notarized owner letter or the signed contract. An owner of the building and lot can demolish a one- or two-story wood-frame building with spans of 25 feet or less, and a Class B general contractor can demolish a one-story Type II or V building if it is also building the new structure on the site.

What You Need Before the Permit Is Issued

  • A dimensioned plot plan showing the buildings and their distances from the property lines (enough for one- and two-family dwellings).
  • A pre-inspection by a Building Inspector, separately for each building.
  • For buildings 45 years or older: mailed notice to abutting owners and occupants, the Council District and the Neighborhood Council, and an 11 by 17 inch "NOTICE OF DEMOLITION" placard within 5 feet of the front property line, at least 30 days before the permit is issued. A detached garage being replaced by an ADU is exempt unless it is in a historic district.
  • A sewer cap permit (a plumbing permit), and a sewer cap inspection before the cap is covered.
  • Possible clearances: Historic Preservation Overlay Zone, Historical Monuments, Coastal Zone, Rent Stabilization (for duplexes and two or more houses on a lot), Urban Forestry for protected trees.
  • A South Coast AQMD Rule 1403 asbestos notification at least 10 working days before work.

What Else to Know in Los Angeles

On site, an inspection must be requested at least 24 hours before work starts, protection fences must be inspected first, and the Demolition Inspection Record card must be signed for each demolition method used. Dozer or loader wrecking is limited to one- or two-story buildings with walls up to 24 feet.

Los Angeles Demolition Permit Fees

Los Angeles does not publish a flat demolition fee we could verify, so we don't quote one. The fee is set when you apply. For scale, the median declared value of demolition work on recent permits was $5,000.

What Los Angeles's Demolition Permit Data Shows

Type of demolitionPermitsShare
Whole building57945%
Garage, shed or other accessory structure69754%
Partial demolition151%

Demolition Permits Issued per Month

105 Nov 129 Dec 95 Jan 111 Feb 135 Mar 107 Apr 98 May 116 Jun 104 Jul 107 Aug 99 Sep 79 Oct
Los Angeles demolition permits issued per month, Nov 2025 to Oct 2026. Lighter bar = current month to date.

Types are classified from each permit's description. Permits whose type or description is demolition, excluding interior, selective and remodel-only work. Data from LADBS Building Permits Issued 2020–Present, October 30, 2025 to October 30, 2026.

Where Demolitions Are Happening

ZIP codePermits (12 mo)
9006654
9004945
9006441
9133535
9003431
9000430

Recent Demolition Permits

IssuedWork as described by the city
2026-10-23DEMOLITION OF THE (E) DETACHED GARAGE.
2026-10-23Eplan: Demolition of (E) 1-story SFD
2026-10-23DEMOLITION OF THE (E) CHICKEN HOUSE.
2026-10-23DEMOLITION OF THE (E) DETACHED GARAGE.
2026-10-22Demolition of (E) 1-story S.F.D. and detached garage
2026-10-22DEMOLISH REAR SINGLE FAMILY DWELLING. SEWER CAP AND PEDESTRIAN PROTECTION FENCE REQUIRED. COMPLY WITH DEPARTME

How to Get a Demolition Permit in Los Angeles

  1. Check historic and landmark status first. It is the step most likely to add weeks or months.
  2. Line up the prerequisites listed above, starting with the asbestos survey, pest control and utility disconnections.
  3. Hire a contractor licensed for demolition where Los Angeles requires one, and sign a written contract.
  4. Apply, post any required notice, and wait out the notice period before work begins.
  5. Pass the final inspection and keep the permit with your property records, especially if you plan to rebuild.

Frequently Asked Questions

Do I need a permit to demolish a house in Los Angeles?

No building can be demolished in Los Angeles without a permit from the Department of Building and Safety (LADBS). A house and its accessory buildings on the same lot can share one permit, which needs a pre-inspection, a sewer cap permit and, for buildings over 45 years old, 30 days of public notice before it is issued.

How long does a demolition permit take in Los Angeles?

For the 1,291 demolition permits issued between October 30, 2025 and October 30, 2026 with both dates published, the median time from application to issue was 90 days, and a quarter took 234 days or longer, according to the city's open data.

How many demolition permits does Los Angeles issue?

1,291 in the 12 months to October 30, 2026. About 45% were for whole buildings, 54% for garages, sheds and other accessory structures, and 1% for partial demolitions, based on the permit descriptions.

Can I demolish my own house in Los Angeles?

Yes, if you own the building and the lot and it is a one- or two-story wood-frame building with spans of 25 feet or less. Otherwise the permit goes to a C-21 wrecking contractor or a Class A general engineering contractor.

Written and maintained by the Home Permit Guide Editorial Team

Last updated

Every rule on this page links to the official source it was checked against. Read our Editorial Policy.

Sources

Official sources checked on . Rules change; confirm with the department before you start work.

  1. LADBS Information Bulletin P/BC 2026-039: Demolition of Buildings (dbs.lacity.gov)
  2. LADBS Building Permits Issued 2020–Present (data.lacity.org)