San Francisco ADU Permit Requirements

Official San Francisco ADU rules, checked against the city's own pages, plus 269 ADU permits issued in the last 12 months.

By the Home Permit Guide Editorial Team Last checked 3 official sources

Reviewed by Ken Pergeson, Permit Expediter & Code Compliance Consultant, Ventura County, CA ·

Short Answer

Yes, two programs

An ADU in San Francisco needs a building permit from the Department of Building Inspection (DBI), filed under either the State ADU program or the City's Local program. State program ADUs get ministerial review at DBI's Permit Review Roundtable with a 60-day timeframe from a complete application; Local program ADUs first need Planning Department in-house review and a Planning Approval Letter.

Source: SF.gov: Get a Building Permit for an Accessory Dwelling Unit (ADU) (linked under Sources below)

San Francisco ADU Permits at a Glance

ADU permits, last 12 months
269
Median application to issue
174 days
Slowest quarter took at least
354 days
New detached ADUs
79

Of the 7 cities we track for ADUs, San Francisco ranks 4 of 7 by median wait. The median declared job value on these permits was $95,438.

Who Can Apply and Do the Work

SF Planning recognizes four ADU types: converted (inside existing space), attached (an expansion), detached (a free-standing building) and junior ADUs, which convert up to 500 square feet of a single-family house and require owner occupancy if the JADU shares sanitation with the house. The two programs cannot be combined on one project.

What You Need Before the Permit Is Issued

  • Check your lot's zoning and existing unit count on the Property Information Map; under the Local program, lots with 4 or fewer legal units can add 1 ADU plus 1 detached ADU, and lots with 5 or more can add unlimited ADUs plus 1 detached ADU.
  • Local program only: submit the Notice of Addition of ADU and a declaration to the Rent Board, then a Project Application (PRJ) for Planning's in-house review.
  • Local program only: confirm there have been no owner move-in evictions in the last 5 years and no other no-fault evictions in the last 10 years.
  • Prepare architectural, structural and mechanical/electrical plans and Title 24 energy compliance for a full permit, or architectural plans only for a site permit.
  • An ADU cannot remove housing services such as a garage, laundry room or storage from existing tenants without a just cause.

What Else to Know in San Francisco

SF.gov says adding a unit typically costs at least $125,000 in materials and labor, with architects and engineers at about 10% of construction costs and City fees at 6% to 9%. State program ADUs skip neighborhood notification and discretionary review, and appeals are barred for permits filed on or after January 1, 2024. Local program ADUs can receive Planning Code waivers but become subject to rent control. ADUs cannot be used as short-term rentals.

San Francisco ADU Permit Costs

ItemOfficial figure
City fees, as a share of construction cost6% to 9% (SF.gov estimate)
Typical construction cost of a new unitAt least $125,000 (SF.gov estimate)

From the official page cited in the Short Answer, checked October 30, 2026.

What San Francisco's ADU Permit Data Shows

Type of ADUPermitsShare
Conversion of a garage, basement or other existing space10639%
New detached ADU7929%
Attached ADU52%
Junior ADU21%
Not specified in the description7729%

ADU Permits Issued per Month

27 Nov 23 Dec 22 Jan 28 Feb 20 Mar 23 Apr 22 May 28 Jun 16 Jul 25 Aug 15 Sep 19 Oct
San Francisco ADU permits issued per month, Nov 2025 to Oct 2026. Lighter bar = current month to date.

Types are classified from each permit's description. Building permits whose description mentions an ADU, JADU or accessory dwelling unit. Data from DataSF: Building Permits, October 30, 2025 to October 30, 2026.

Where ADUs Are Being Permitted

NeighborhoodPermits (12 mo)
Sunset/Parkside34
Mission24
Bayview Hunters Point22
West of Twin Peaks20
Bernal Heights16
Oceanview/Merced/Ingleside13

Recent ADU Permits

IssuedWork as described by the city
2026-10-28legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition o
2026-10-28legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition o
2026-10-27new adu first floor using state program sec. 65852.2. adu will incl. new bedrm, kitchen, bathrm, & living rm.
2026-10-27new adu first floor using state program sec. 65852.2. adu will incl. new bedrm, kitchen, bathrm, & living rm.
2026-10-23add state adu in proposed single family dwelling per ord 95-17, ref pa #202003035977. no change to the buildin
2026-10-23to comply with nov #202654587: repair fire-damaged (2) bathrooms, (2) kitchens, replace sheetrock throughout.

How to Get an ADU Permit in San Francisco

  1. Confirm what your lot allows. Zoning, existing unit count, hillside, fire and historic status decide which ADU types and how many you can add.
  2. Choose the program and plans. Decide between the State program and the Local program; they cannot be combined.
  3. Complete the prerequisites listed above before you file.
  4. File the building permit through PermitSF, over the counter or for in-house review.
  5. Build, pass inspections and get final sign-off before anyone moves in.

Frequently Asked Questions

Do I need a permit to build an ADU in San Francisco?

An ADU in San Francisco needs a building permit from the Department of Building Inspection (DBI), filed under either the State ADU program or the City's Local program. State program ADUs get ministerial review at DBI's Permit Review Roundtable with a 60-day timeframe from a complete application; Local program ADUs first need Planning Department in-house review and a Planning Approval Letter.

How long does an ADU permit take in San Francisco?

For the 266 ADU permits issued between October 30, 2025 and October 30, 2026 with both dates published, the median time from application to issue was 174 days, and a quarter took 354 days or longer, according to the city's open data.

How many ADU permits does San Francisco issue?

269 in the 12 months to October 30, 2026. About 39% converted existing space such as a garage, 29% were new detached units, 2% were attached and 1% were junior ADUs, based on the permit descriptions.

What is the difference between the State and Local ADU programs in San Francisco?

State program ADUs are ministerial: a 60-day review from a complete application, no neighborhood notification or discretionary review, and no Planning Code compliance for things like rear yards. Local program ADUs need Planning in-house review first, can get Planning Code waivers and allow more ADUs on some multi-family lots, but are subject to rent control.

Can I rent my San Francisco ADU on Airbnb?

No. SF Planning says ADUs are ineligible for the Short-Term Rental program.

Written and maintained by the Home Permit Guide Editorial Team

Last updated

Every rule on this page links to the official source it was checked against. Read our Editorial Policy.

Sources

Official sources checked on . Rules change; confirm with the department before you start work.

  1. SF.gov: Get a Building Permit for an Accessory Dwelling Unit (ADU) (sf.gov)
  2. SF Planning: Accessory Dwelling Units (sfplanning.org)
  3. DataSF: Building Permits (data.sfgov.org)