- Issued in October 2026 to date
- 1,233
- Issued in the last 30 days
- 1,303
- Median days, filing to issue
- 4
These figures cover every permit in DataSF: Building Permits, not only home projects. The last 30 days run from September 30, 2026 to October 29, 2026. That is 31% below the average of 1,876 permits a month over the previous 12 full months.
Top Permit Types in the Last 30 Days
| Permit type | Permits | Share |
|---|---|---|
| OTC Alterations Permit | 1,208 | 93% |
| Additions, Alterations or Repairs | 78 | 6% |
| Demolitions | 2 | 0% |
| Sign: Erect | 2 | 0% |
| Grade, Quarry, Fill or Excavate | 1 | 0% |
San Francisco is an over-the-counter city for small work. Of the 1,303 permits issued in the 30 days to October 29, 2026, 1,208 were OTC alterations permits. DBI can approve these at the counter without sending plans through full review, which is why the median time from filing to issue was just 4 days. Projects that need full plan review, filed as "additions, alterations or repairs", made up 78 permits in the same period and usually take far longer.
DataSF's building permit dataset does not name contractors, so the table below has no contractor column. Each record does carry its neighborhood analysis boundary, which is how we rank areas: Financial District/South Beach (183), Sunset/Parkside (81) and Mission (76) were the busiest in the last 30 days.
12-Month Permit Trend in San Francisco
| Month | Permits issued |
|---|---|
| October 2025 | 2,237 |
| November 2025 | 1,934 |
| December 2025 | 2,037 |
| January 2026 | 2,047 |
| February 2026 | 1,898 |
| March 2026 | 1,869 |
| April 2026 | 2,103 |
| May 2026 | 1,770 |
| June 2026 | 1,961 |
| July 2026 | 1,713 |
| August 2026 | 1,495 |
| September 2026 | 1,453 |
| October 2026 (to date) | 1,233 |
Over the 12 full months, the busiest was October 2025 with 2,237 permits and the quietest was September 2026 with 1,453.
Busiest Areas in the Last 30 Days
| Neighborhood | Permits |
|---|---|
| Financial District/South Beach | 183 |
| Sunset/Parkside | 81 |
| Mission | 76 |
| West of Twin Peaks | 72 |
| Outer Richmond | 66 |
| Marina | 64 |
| Pacific Heights | 61 |
| Noe Valley | 49 |
| Castro/Upper Market | 46 |
| Inner Richmond | 41 |
Recent Permits
The 15 most recent permits in the feed. We show the neighborhood rather than the street address, and never owner names.
| Issued | Type | Neighborhood |
|---|---|---|
| 2026-10-29 | OTC Alterations Permit | West of Twin Peaks |
| 2026-10-29 | OTC Alterations Permit | Visitacion Valley |
| 2026-10-29 | OTC Alterations Permit | Pacific Heights |
| 2026-10-29 | OTC Alterations Permit | Tenderloin |
| 2026-10-29 | OTC Alterations Permit | Tenderloin |
| 2026-10-29 | OTC Alterations Permit | Sunset/Parkside |
| 2026-10-29 | OTC Alterations Permit | Potrero Hill |
| 2026-10-29 | OTC Alterations Permit | Financial District/South Beach |
| 2026-10-29 | OTC Alterations Permit | Bayview Hunters Point |
| 2026-10-29 | OTC Alterations Permit | Financial District/South Beach |
| 2026-10-29 | OTC Alterations Permit | Presidio Heights |
| 2026-10-29 | OTC Alterations Permit | Glen Park |
| 2026-10-29 | OTC Alterations Permit | Financial District/South Beach |
| 2026-10-29 | OTC Alterations Permit | Chinatown |
| 2026-10-29 | OTC Alterations Permit | Marina |
How to Look Up a Building Permit in San Francisco
- San Francisco DBI Permit/Complaint Tracking System: Search by Address: Open the Department of Building Inspection (DBI) Permit/Complaint Tracking System.
- Search by street number and street name. The suffix and unit are optional, and DBI suggests leaving the suffix off if the address is not found.
- If the address still does not appear, search by block and lot instead. DBI notes that addresses or lots that were split, merged or discontinued must be researched in person.
- Choose the matching address to see its building, electrical, plumbing and boiler permits, plus any complaints.
- Open a permit number to see its status, its description and the inspection history. DBI says its online records go back to the 1980s.
For what a record's fields mean, see How to Read a Building Permit Record. For lookups in other cities, see How to Look Up Building Permits for a House.
San Francisco Project Permit Pages
Rules for specific home projects in San Francisco, each checked against official city sources:
- Do You Need a Roofing Permit in San Francisco?
- Do You Need an HVAC Permit in San Francisco?
- Do You Need a Solar Panel Permit in San Francisco?
- Do You Need a Fence Permit in San Francisco?
- Do You Need a Deck Permit in San Francisco?
- San Francisco Building Permit Fees: Table 1A-A With Real Project Values
Frequently Asked Questions
How many building permits does San Francisco issue?
San Francisco issued 1,303 permits in the 30 days to October 29, 2026, and an average of 1,876 a month over the 12 full months before October 2026, according to DataSF: Building Permits.
How long does it take to get a building permit in San Francisco?
For permits issued in the 30 days to October 29, 2026, the median time from filing to issue was 4 days. Simple permits are often issued much faster than projects that need full plan review.
How do I look up a building permit in San Francisco?
Use the San Francisco DBI Permit/Complaint Tracking System: Search by Address. Search by street number and street name. The suffix and unit are optional, and DBI suggests leaving the suffix off if the address is not found.
What is the most common permit type in San Francisco?
OTC Alterations Permit, with 1,208 of the 1,303 permits issued in the 30 days to October 29, 2026.
Back to San Francisco Building Permits for Home Projects.
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- San Francisco DBI Permit/Complaint Tracking System: Search by Address (linked above) (dbiweb02.sfgov.org)
- SF.gov: Permitting (sf.gov)
- DataSF: Building Permits (data.sf.gov)
Statistics computed by Home Permit Guide from DataSF: Building Permits, fetched October 30, 2026.