Key Takeaways
- The IRC exempts decks only if they are 200 sq ft or less, no more than 30 inches above grade, unattached and not serving the exit door.
- Seattle requires a permit above 18 inches; Philadelphia exempts decks under 12 inches.
- Attached decks almost always need a permit, because the ledger connection is a common failure point.
- Seattle and Philadelphia issue most simple deck permits quickly through STFI and EZ permits.
- Zoning lot coverage and setbacks apply to decks too.
Deck Permit Thresholds
- Philadelphia: decks under 12 inches above ground need no permit; decks up to 216 sq ft can use an EZ permit.
- Seattle: a permit is needed above 18 inches or for any roof deck; most get a same-day STFI permit.
- Austin: exempt only if 200 sq ft or less, 30 inches or less above grade, detached, not an exit route, and outside a flood hazard area.
- Chicago: in-kind rebuilds up to 6 ft high with a landing of 50 sq ft or less need no permit; new decks do.
- Nashville: new and replacement decks need a permit, as does replacing more than 100 sq ft of deck boards.
- Raleigh: new decks need a permit; replacing boards, railings or treads is exempt under $40,000.
- Baltimore: decks are not on the exempt list and need footing and final inspections.
City-By-City Deck Permit Rules
These summaries come from the same official sources as our city pages and were last checked October 30, 2026. Permit counts are the city's own open-data records for the last 12 months.
Chicago: Usually Yes
A permit is needed for most porch and deck work. The exceptions are in-kind replacement of non-structural parts (deck boards, treads, pickets) and in-kind repair or replacement of a whole porch, deck or stair system no more than 6 feet above ground with a landing of 50 sq ft or less.
- Exempt: in-kind replacement of deck boards, stair treads or railing pickets (if no violation has been issued).
- Exempt: in-kind rebuild of a porch or deck up to 6 ft high with a landing of 50 sq ft or less.
- New decks, size or layout changes and enclosed porches need a plan-based permit.
- Chicago issued 1,350 matching permits in the last 12 months, with a median of 13 days from application to issue.
Source: Chicago DOB: Porches, Decks and Balconies (work not requiring a permit) · Full details: Chicago Deck Permits
Austin: Usually Yes
A deck is exempt only if it is 200 sq ft or less, no more than 30 inches above grade, not attached to the house, not used for egress and not in a flood hazard area. Other decks need a building permit; repairs limited to existing deck boards are exempt.
- Exempt: detached decks up to 200 sq ft and 30 in above grade.
- Exempt: non-structural repairs limited to deck boards.
- Attached decks need a building permit.
- Austin issued 385 matching permits in the last 12 months, with a median of 104 days from application to issue.
Source: Austin DSD: Work Exempt from Building Permits
Seattle: Sometimes
You need a construction permit for a deck more than 18 inches above the ground or any roof deck. Most decks on neighborhood residential lots get a same-day Subject-to-Field-Inspection (STFI) permit.
- Permit if more than 18 in above ground or a roof deck (SRC R105.2).
- Most decks qualify for an over-the-counter STFI permit.
- Decks over 36 in count toward lot coverage.
- Seattle issued 88 matching permits in the last 12 months, with a median of 7 days from application to issue.
Source: Seattle SDCI Tip 312: Decks, Fences and Arbors
Philadelphia: Usually Yes
Decks less than 12 inches above ground need no permit. Higher decks need a building permit, and a zoning permit too if they exceed 216 sq ft, sit above the first floor or are in a front or side yard. Decks up to 216 sq ft can use an EZ permit.
- Under 12 in above ground: no permit.
- Over 12 in: building permit; EZ permit for decks up to 216 sq ft.
- Zoning permit if over 216 sq ft, above the first floor, or in a front/side yard.
- Philadelphia issued 397 matching permits in the last 12 months.
Source: Philadelphia L&I: Start Right guide (June 2026) · Full details: Philadelphia Deck Permits
Baltimore: Yes
Decks are not on Baltimore's list of work exempt from permit, so building one needs a building permit. The City requires a footing inspection and a final inspection for decks.
- Decks are not on the exempt list.
- Required inspections: footing and final.
- Zoning setbacks apply.
- Baltimore issued 773 matching permits in the last 12 months.
Source: Baltimore DHCD: Work Exempt from Permit · Full details: Baltimore Deck Permits
Nashville: Yes
Building a new deck or replacing a deck requires a permit in Nashville, as does replacing more than 100 sq ft of deck boards or any footings or framing. Removing a deck without replacing it does not.
- Permit: new or replacement decks.
- Permit: deck board replacement over 100 sq ft, or any footing/framing work.
- Owner-occupants can self-permit; LLC/trust owners only for work under $25,000.
- Nashville issued 222 matching permits in the last 12 months, with a median of 13 days from application to issue.
Source: Metro Nashville Codes: Add a Deck or Patio to a Residence
Raleigh: Yes
New decks need a building permit in Raleigh. Under state law, replacing only deck boards, railings, pickets or stair treads is exempt when it costs $40,000 or less.
- New decks and porches: building permit.
- Exempt: replacing decking, railings, pickets or treads up to $40,000.
- Load-bearing work always needs a permit.
- Raleigh issued 529 matching permits in the last 12 months, with a median of 24 days from application to issue.
Source: Raleigh: How to Get a Residential Permit · Full details: Raleigh Deck Permits
San Francisco: Usually Yes
Decks need a building permit in San Francisco. In-kind repair of less than 50% of a deck or stairs is an over-the-counter permit without plans; larger repairs and new decks under 20 feet above grade that meet Planning setbacks need plans. Platforms no more than 30 inches above grade that aren't part of an exit are exempt.
- Exempt: platforms up to 30 in above grade, not over a story below and not part of an exit.
- Repairing under 50% of a deck or stairs: OTC permit without plans.
- Repairing over 50%, or a new deck under 20 ft above grade: OTC permit with plans.
- San Francisco issued 518 matching permits in the last 12 months, with a median of 5 days from application to issue.
Source: SF.gov: Where to apply for your permit · Full details: San Francisco Deck Permits
New Orleans: Usually Yes
Only small freestanding decks are exempt in New Orleans: uncovered residential decks no larger than 200 sq ft, no higher than 30 inches above grade, not attached to the house and not serving an exit door. Replacing deteriorated unenclosed, uncovered porches and steps 5 feet or less above grade is also exempt.
- Exempt: uncovered, detached decks up to 200 sq ft and 30 in high that don't serve an exit.
- Exempt: replacing deteriorated uncovered porches and steps up to 5 ft high.
- Roofs over porches and their framing are not exempt.
- New Orleans issued 92 matching permits in the last 12 months, with a median of 39 days from application to issue.
Source: New Orleans: Work Exempt from Permit (Section 105.2) · Full details: New Orleans Deck Permits
Pittsburgh: Usually Yes
Uncovered decks with a floor 30 inches or less above grade need zoning approval only. All other decks need a building permit and occupancy permit; a prescriptive deck guide can replace stamped drawings for single-story wood decks 8 feet or less high.
- Uncovered decks up to 30 in above grade: zoning approval only.
- Other decks: building permit and occupancy permit.
- Decks other than single-story wood decks up to 8 ft high need construction drawings.
- Pittsburgh issued 125 matching permits in the last 12 months.
Source: Pittsburgh PLI: Deck Information · Full details: Pittsburgh Deck Permits
Kansas City: Sometimes
Platforms and decks no higher than 30 inches above grade at any point, and not over a basement or story below, don't need a building permit in Kansas City. Higher decks do, and all work must still meet the zoning and building codes.
- Exempt: decks up to 30 in above grade, not over a basement or story below.
- Higher decks need a building permit.
- Exempt work must still meet the Zoning and Development Code.
- Kansas City issued 314 matching permits in the last 12 months, with a median of 10 days from application to issue.
Source: KCMO: Building Permit Exempt Work · Full details: Kansas City Deck Permits
| City | Permit needed? | Permits (12 mo) | Median days to issue |
|---|---|---|---|
| Chicago | Usually yes | 1,350 | 13 |
| Austin | Usually yes | 385 | 104 |
| Seattle | Sometimes | 88 | 7 |
| Philadelphia | Usually yes | 397 | Not published |
| Baltimore | Yes | 773 | Not published |
| Nashville | Yes | 222 | 13 |
| Raleigh | Yes | 529 | 24 |
| San Francisco | Usually yes | 518 | 5 |
| New Orleans | Usually yes | 92 | 39 |
| Pittsburgh | Usually yes | 125 | Not published |
| Kansas City | Sometimes | 314 | 10 |
Repairs Versus Rebuilds
Board-for-board repairs are the most commonly exempt deck work: Chicago, Austin and North Carolina all exempt replacing deck boards in kind. Footings, beams and ledgers are structural and nearly always bring a permit. The ledger connection to the house is where inspectors focus, because that is where decks fail.
Deck Permit Pages by City
See Seattle Deck Permits, Austin Deck Permits and Nashville Deck Permits, plus the same-day option in Seattle STFI Permits for Decks. All cities: Deck Permits by City.
Inspections for a Permitted Deck
A typical deck permit includes a footing inspection before concrete is placed, a framing inspection, and a final. The framing inspection is where ledger flashing and fasteners, joist hangers and guard posts are checked, so do not install decking boards until it passes. Building Permit Inspections: What Inspectors Check and When explains each stage.
Frequently Asked Questions
How high can a deck be without a permit?
Philadelphia: under 12 inches. Seattle: 18 inches or less. Austin: 30 inches or less and 200 sq ft or less, detached.
Do I need a permit to replace deck boards?
Usually not for in-kind board replacement in Chicago, Austin and Raleigh. Nashville requires a permit when more than 100 sq ft of boards are replaced.
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- Philadelphia L&I: Start Right guide (June 2026) (linked above) (phila.gov)
- Philadelphia L&I: Get permits without plans (EZ permits) (phila.gov)
- Seattle SDCI Tip 312: Decks, Fences and Arbors (linked above) (web.seattle.gov)
- Austin DSD: Work Exempt from Building Permits (linked above) (austintexas.gov)
- Chicago DOB: Porches, Decks and Balconies (work not requiring a permit) (linked above) (chicago.gov)
- Metro Nashville Codes: Add a Deck or Patio (linked above) (nashville.gov)
- Raleigh: How to Get a Residential Permit (linked above) (raleighnc.gov)
- NC OSFM guidance on G.S. 160D-1110(c) (ncosfm.gov)
- Baltimore DHCD: Permit Guidelines and Forms (baltimorecity.gov)
- ICC: 2021 International Residential Code, Chapter 1 (Scope and Administration) (codes.iccsafe.org)