Do You Need a Deck Permit in Pittsburgh?

Short answer
Usually yes

Uncovered decks with a floor 30 inches or less above grade need zoning approval only. All other decks need a building permit and occupancy permit; a prescriptive deck guide can replace stamped drawings for single-story wood decks 8 feet or less high.

Source: Pittsburgh PLI: Deck Information

A grey wooden deck overlooking a grassy backyard
Get 3 Local Quotes

Pittsburgh Deck Permits at a Glance

Permits, last 12 months
125
Issued, last 30 days
13
Median application to issue
Not published
Median declared job value
$22,000
Issuing office
Pittsburgh Department of Permits, Licenses, and Inspections (PLI)
Rule last checked
October 30, 2026

Permits Issued per Month

8 Nov 9 Dec 5 Jan 2 Feb 3 Mar 10 Apr 10 May 13 Jun 21 Jul 11 Aug 19 Sep 13 Oct
Pittsburgh deck permits issued per month, Nov 2025 to Oct 2026. Lighter bar = current month to date.

Counts are approximate: we match permit types and descriptions to deck work. Data from WPRDC: PLI Permits, refreshed October 30, 2026.

What Pittsburgh's Rules Say

  • Uncovered decks up to 30 in above grade: zoning approval only.
  • Other decks: building permit and occupancy permit.
  • Decks other than single-story wood decks up to 8 ft high need construction drawings.

Pittsburgh Deck Permit Fees

We have not verified Pittsburgh's fee for this work from an official fee schedule yet, so we don't quote one. The Pittsburgh Department of Permits, Licenses, and Inspections (PLI) sets the fee when you apply.

Busiest Areas for Deck Permits

NeighborhoodPermits (12 mo)
Squirrel Hill South10
Hazelwood7
Greenfield7
Shadyside6
Brookline6
Perry South5

How to Get a Deck Permit in Pittsburgh

  1. Confirm the rule for your exact job on the official page cited above. Size, height, structure and location (historic district, floodplain) can change the answer.
  2. Choose who applies. Many permits here must be pulled by a licensed contractor; ask any contractor to name the license they will use.
  3. Apply with the Pittsburgh Department of Permits, Licenses, and Inspections (PLI) through the official department website.
  4. Schedule inspections as the permit requires, and keep the final approval with your house records.

Recent Pittsburgh Deck Permits

IssuedAddressWork
2026-10-20659 Frayne StWire and install new THHN wire to the deck outlet, shed outlet, coach light, and flood light.
2026-10-16230 4Th AveINTERIOR ALTERATIONS FOR CONCRETE REPAIRS, NEW DECK SLAB COATING, LINE STRIPING.
2026-10-161409 Columbus AveCity Funded Demolition 1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, acc
2026-10-151099 Arlington AveREPAIR WORK TO REAR PORCH COLUMNS
2026-10-14625 Suismon StDEMOLITION & RECONSTRUCTION OF WOOD STAIRS TO GRADE FROM 2ND FLOOR PORCH
2026-10-13244 Robinson StPORCH REPAIR, REPLACE PORCH POSTS AND GUARDS
2026-10-123016 Shady AveCONSTRUCTION OF SECOND FLOOR (9 FEET ABOVE GRADE) WOOD FRAMED DECK AT REAR OF DWELLING.
2026-10-09509 Roslyn PlINTERIOR ALTERATIONS FOR STUCTURAL FRAMING REPAIR, EXTERIOR ALTERATIONS FOR DECK REPLACMENT.
2026-10-08400 Cedar AveEXTERIOR ALTERATIONS INCLUDING INSTALLED NEW LIFT, HANDRAILS AND GUARDS, NEW TOPPING SLAB AT PORCH, NEW DOORS AT 1ST AND
2026-10-07127 Penham LnBUILD NEW FRONT PORCH (8'-0" X 5'-6"), REPLACE FRONT DOOR AND SIDELIGHTS

Addresses and work descriptions as published by the city. Owner names and phone numbers are removed.

Pittsburgh Deck Contractors: Get Weekly Permit Lists

Contractors: get new permits for your trade and city every Monday. Join the waitlist.

Frequently Asked Questions

Do I need a deck permit in Pittsburgh?

Usually yes. Uncovered decks with a floor 30 inches or less above grade need zoning approval only. All other decks need a building permit and occupancy permit; a prescriptive deck guide can replace stamped drawings for single-story wood decks 8 feet or less high.

How many deck permits does Pittsburgh issue?

Pittsburgh issued 125 permits matching deck work between October 30, 2025 and October 30, 2026, about 10 a month. The busiest month was Jul 2026 with 21.

How much does a deck permit cost in Pittsburgh?

We have not yet verified Pittsburgh's fee for this work from an official fee schedule, so we do not quote one. The fee is set by the Pittsburgh Department of Permits, Licenses, and Inspections (PLI) when you apply.

How long does it take to get a deck permit in Pittsburgh?

Pittsburgh's open data for these records does not include usable application dates, so we cannot calculate a processing time. Ask the Pittsburgh Department of Permits, Licenses, and Inspections (PLI) for current timelines.

Who issues deck permits in Pittsburgh?

The Pittsburgh Department of Permits, Licenses, and Inspections (PLI).

Related Permit Guides

Written and maintained by the Home Permit Guide Editorial TeamPlaceholder profile

Last updated

This is a placeholder editorial profile. A named reviewer with verifiable experience will be added here. Until then, every rule on this page links to the official government source it was checked against. Read our editorial policy.

Sources

Official sources checked on . Rules change; confirm with the department before you start work.

  1. Pittsburgh PLI: Deck Information (linked above) (pittsburghpa.gov)