Do You Need a Deck Permit in Philadelphia?
Usually yes
Decks less than 12 inches above ground need no permit. Higher decks need a building permit, and a zoning permit too if they exceed 216 sq ft, sit above the first floor or are in a front or side yard. Decks up to 216 sq ft can use an EZ permit.
Philadelphia Deck Permits at a Glance
- Permits, last 12 months
- 397
- Issued, last 30 days
- 30
- Median application to issue
- Not published
- Median permit fee paid
- Not published
- Issuing office
- Philadelphia Department of Licenses and Inspections (L&I)
- Rule last checked
- October 30, 2026
Permits Issued per Month
Counts are approximate: we match permit types and descriptions to deck work. Data from Philadelphia L&I Permits (Carto), refreshed October 30, 2026.
What Philadelphia's Rules Say
- Under 12 in above ground: no permit.
- Over 12 in: building permit; EZ permit for decks up to 216 sq ft.
- Zoning permit if over 216 sq ft, above the first floor, or in a front/side yard.
Philadelphia Deck Permit Fees
We have not verified Philadelphia's fee for this work from an official fee schedule yet, so we don't quote one. The Philadelphia Department of Licenses and Inspections (L&I) sets the fee when you apply.
Busiest Areas for Deck Permits
| ZIP code | Permits (12 mo) |
|---|---|
| 19119 | 29 |
| 19135 | 25 |
| 19143 | 24 |
| 19111 | 23 |
| 19141 | 21 |
| 19128 | 21 |
How to Get a Deck Permit in Philadelphia
- Confirm the rule for your exact job on the official page cited above. Size, height, structure and location (historic district, floodplain) can change the answer.
- Choose who applies. Many permits here must be pulled by a licensed contractor; ask any contractor to name the license they will use.
- Apply with the Philadelphia Department of Licenses and Inspections (L&I) through the official department website.
- Schedule inspections as the permit requires, and keep the final approval with your house records.
Recent Philadelphia Deck Permits
| Issued | Address | Work |
|---|---|---|
| 2026-10-29 | 1332 Yerkes St | FOR THE ERECTION OF ACCESSORY REAR SUN DECK ACCESS FROM FIRST FLOOR REAR AS PART OF AN EXISTING ATTACHED STRUCTURE. SIZE |
| 2026-10-29 | 8129 Halstead St | FOR THE ERECTION OF A NEW SEMI-DETACHED STRUCTURE WITH CELLAR AND REAR SUN DECK ACCESS FROM REAR FIRST FLOOR. SIZE AND L |
| 2026-10-29 | 8127 Halstead St | FOR THE ERECTION OF A NEW SEMI-DETACHED STRUCTURE WITH CELLAR AND REAR SUN DECK ACCESS FROM REAR FIRST FLOOR. SIZE AND L |
| 2026-10-29 | 3612 N 9Th St | Adding a single GFI outlet to the existing porch for a stair lift trickle charger to plug in to. |
| 2026-10-28 | 1521 Beverly Rd | EZ PERMIT DECKS - For New Decks to an Existing One Family Dwelling as per attached standards. Deviations from these stan |
| 2026-10-28 | 6742 N Broad St | FOR THE PARTIAL DEMOLITION OF AN EXISTING STRUCTURE (FRONT PORCH). SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS |
| 2026-10-27 | 5155 N Hutchinson St | Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE as per Residential Ser |
| 2026-10-26 | 250 E Clearfield St | Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE as per Residential Ser |
| 2026-10-23 | 10834 Rennard St | Installation of outdoor 2 rear decks GFCI outlets and 4 lights BY FISHING ONLY. |
| 2026-10-21 | 6018 Chestnut St | MAKE SAFE PERMIT TO COMPLY WITH CF-2025-133417 TO INCLUDE PARTIAL DEMOLITION AND REPLACEMENT OF FRONT PORCH AND FRAMING |
Addresses and work descriptions as published by the city. Owner names and phone numbers are removed.
Frequently Asked Questions
Do I need a deck permit in Philadelphia?
Usually yes. Decks less than 12 inches above ground need no permit. Higher decks need a building permit, and a zoning permit too if they exceed 216 sq ft, sit above the first floor or are in a front or side yard. Decks up to 216 sq ft can use an EZ permit.
How many deck permits does Philadelphia issue?
Philadelphia issued 397 permits matching deck work between October 30, 2025 and October 30, 2026, about 33 a month. The busiest month was Jun 2026 with 43.
How much does a deck permit cost in Philadelphia?
We have not yet verified Philadelphia's fee for this work from an official fee schedule, so we do not quote one. The fee is set by the Philadelphia Department of Licenses and Inspections (L&I) when you apply.
How long does it take to get a deck permit in Philadelphia?
Philadelphia's open data for these records does not include usable application dates, so we cannot calculate a processing time. Ask the Philadelphia Department of Licenses and Inspections (L&I) for current timelines.
Who issues deck permits in Philadelphia?
The Philadelphia Department of Licenses and Inspections (L&I).
Related Permit Guides
- Philadelphia Roofing Permits
- Philadelphia HVAC Permits
- Philadelphia Fence Permits
- Baltimore Deck Permits
- Chicago Deck Permits
- Deck Permits by City
- When a Deck Needs a Permit: Height and Size Rules by City
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- Philadelphia L&I: Start Right guide (June 2026) (linked above) (phila.gov)
- Philadelphia L&I: Get permits without plans (EZ permits) (phila.gov)