- Issued in October 2026 to date
- 1,221
- Issued in the last 30 days
- 1,287
- Median days, filing to issue
- 6
These figures cover every permit in NOLA Permits (data.nola.gov), not only home projects. The last 30 days run from September 30, 2026 to October 29, 2026. That is 14% below the average of 1,494 permits a month over the previous 12 full months.
Top Permit Types in the Last 30 Days
| Permit type | Permits | Share |
|---|---|---|
| Electrical Service / Circuit / Feeder | 288 | 22% |
| Mechanical Fuel Gas | 194 | 15% |
| Mechanical HVAC | 143 | 11% |
| Electrical Vacancy | 125 | 10% |
| Residential Re-Roofing | 98 | 8% |
| Renovation (Structural or Non-Structural) | 89 | 7% |
| Change of Address | 83 | 6% |
| Construction Loop | 43 | 3% |
Most New Orleans permits are for trade work rather than whole projects. In the 30 days to October 29, 2026, the City issued 288 electrical service permits, 194 fuel gas permits and 143 HVAC permits, against 98 residential re-roofing permits and 89 renovations. The median from filing to issue was 6 days.
The City's dataset lists the contractor on 85% of recent permits. Areas are the neighborhoods recorded on each permit; Audubon (66), Seventh Ward (55) and French Quarter (54) were the busiest in the last 30 days.
12-Month Permit Trend in New Orleans
| Month | Permits issued |
|---|---|
| October 2025 | 1,731 |
| November 2025 | 1,285 |
| December 2025 | 1,272 |
| January 2026 | 1,311 |
| February 2026 | 1,262 |
| March 2026 | 1,508 |
| April 2026 | 1,519 |
| May 2026 | 1,989 |
| June 2026 | 1,561 |
| July 2026 | 1,536 |
| August 2026 | 1,425 |
| September 2026 | 1,531 |
| October 2026 (to date) | 1,221 |
Over the 12 full months, the busiest was May 2026 with 1,989 permits and the quietest was February 2026 with 1,262.
Busiest Areas in the Last 30 Days
| Neighborhood | Permits |
|---|---|
| Audubon | 66 |
| Seventh Ward | 55 |
| French Quarter | 54 |
| Little Woods | 49 |
| St Roch | 48 |
| Central City | 44 |
| Central Business District | 42 |
| Lakeview | 41 |
| Treme - Lafitte | 35 |
| Old Aurora | 34 |
Recent Permits
The 15 most recent permits in the feed. We show the neighborhood rather than the street address, and never owner names.
| Issued | Type | Neighborhood | Contractor |
|---|---|---|---|
| 2026-10-29 | Mechanical Fuel Gas | Lakeview | JAMES T BROUSSARD |
| 2026-10-29 | Mechanical Fuel Gas | Treme - Lafitte | Edgar NMI Young, Jr. |
| 2026-10-29 | Mechanical Fuel Gas | Treme - Lafitte | Edgar NMI Young, Jr. |
| 2026-10-29 | Mechanical Fuel Gas | Treme - Lafitte | Edgar NMI Young, Jr. |
| 2026-10-29 | Electrical Vacancy | Central City | Troy Anthony Kelley |
| 2026-10-29 | Mechanical Fuel Gas | Treme - Lafitte | Edgar NMI Young, Jr. |
| 2026-10-29 | Mechanical Fuel Gas | Read Blvd West | Diony Meunier |
| 2026-10-29 | Mechanical HVAC | Central Business District | Tuong Xuan Nguyen |
| 2026-10-29 | Electrical Vacancy | Tulane - Gravier | Mark Gerard Andrews, Sr. |
| 2026-10-29 | Interior Demolition | Central City | Carimi Construction and Development |
| 2026-10-29 | Renovation (Structural or Non-Structural) | Pines Village | Roubion Construction Co., LLC |
| 2026-10-29 | Residential Re-Roofing | West Lake Forest | Baron Construction Co |
| 2026-10-29 | Mechanical HVAC | Gentilly Terrace | Ira A Preuett |
| 2026-10-29 | Construction Loop | Leonidas | Dennis Leon deBoisblanc Sr. |
| 2026-10-29 | Renovation (Structural) | Marigny | Not listed |
How to Look Up a Building Permit in New Orleans
- City of New Orleans One Stop App: Open the One Stop App.
- Type the house number and street into the search box at the top, for example "1300 Perdido St". Leave out the city, state, ZIP and any apartment or suite number.
- Click Search. The results list the permits, licenses, planning projects and violations tied to that address.
- If the address does not come up, try the legal street name and spelling, and drop uncommon street suffixes.
- Open a record to see its status, reviews and inspections. One Stop can be reached at (504) 658-7100 for help.
For what a record's fields mean, see How to Read a Building Permit Record. For lookups in other cities, see How to Look Up Building Permits for a House.
New Orleans Project Permit Pages
Rules for specific home projects in New Orleans, each checked against official city sources:
- Do You Need a Roofing Permit in New Orleans?
- Do You Need an HVAC Permit in New Orleans?
- Do You Need a Solar Panel Permit in New Orleans?
- Do You Need a Fence Permit in New Orleans?
- Do You Need a Deck Permit in New Orleans?
Frequently Asked Questions
How many building permits does New Orleans issue?
New Orleans issued 1,287 permits in the 30 days to October 29, 2026, and an average of 1,494 a month over the 12 full months before October 2026, according to NOLA Permits (data.nola.gov).
How long does it take to get a building permit in New Orleans?
For permits issued in the 30 days to October 29, 2026, the median time from filing to issue was 6 days. Simple permits are often issued much faster than projects that need full plan review.
How do I look up a building permit in New Orleans?
Use the City of New Orleans One Stop App. Type the house number and street into the search box at the top, for example "1300 Perdido St". Leave out the city, state, ZIP and any apartment or suite number.
What is the most common permit type in New Orleans?
Electrical Service / Circuit / Feeder, with 288 of the 1,287 permits issued in the 30 days to October 29, 2026.
Back to New Orleans Building Permits for Home Projects.
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- City of New Orleans One Stop App (linked above) (onestopapp.nola.gov)
- City of New Orleans: Search Permits and Violations (nola.gov)
- NOLA Permits (data.nola.gov) (data.nola.gov)
Statistics computed by Home Permit Guide from NOLA Permits (data.nola.gov), fetched October 30, 2026.