Do You Need a Solar Panel Permit in Chicago?
Yes
New small rooftop solar systems up to 13.44 kW inverter output can use Chicago's Express Permit Program, with drawings and calculations from an Illinois-licensed architect or structural engineer. Larger systems, roofs over 40 feet and some ballasted systems need a standard permit.
Source: Chicago DOB Express Permit Program: Small-Scale Solar PV System
Chicago Solar Panel Permits at a Glance
- Permits, last 12 months
- 1,615
- Issued, last 30 days
- 125
- Median application to issue
- 10 days
- Median declared job value
- $21,160
- Issuing office
- Chicago Department of Buildings
- Rule last checked
- October 30, 2026
Permits Issued per Month
Counts are approximate: we match permit types and descriptions to solar panel work. Data from Chicago Building Permits, refreshed October 30, 2026.
What Chicago's Rules Say
- Express Permit limit: 13.44 kW inverter output.
- Drawings and calculations by an Illinois-licensed architect or structural engineer are required.
- Associated battery storage is generally limited to 20 kWh under the Express route.
Chicago Solar Panel Permit Fees
We have not verified Chicago's fee for this work from an official fee schedule yet, so we don't quote one. The Chicago Department of Buildings sets the fee when you apply. For context, the median fee actually paid on these permits in the city's records was $300.
Busiest Areas for Solar Panel Permits
| Community area | Permits (12 mo) |
|---|---|
| Community area 70 | 105 |
| Community area 73 | 84 |
| Community area 71 | 83 |
| Community area 49 | 79 |
| Community area 53 | 64 |
| Community area 25 | 58 |
How to Get a Solar Panel Permit in Chicago
- Confirm the rule for your exact job on the official page cited above. Size, height, structure and location (historic district, floodplain) can change the answer.
- Choose who applies. Many permits here must be pulled by a licensed contractor; ask any contractor to name the license they will use.
- Apply with the Chicago Department of Buildings through the official department website.
- Schedule inspections as the permit requires, and keep the final approval with your house records.
Recent Chicago Solar Panel Permits
| Issued | Address | Work |
|---|---|---|
| 2026-10-28 | 4359 S Wells St | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 0. |
| 2026-10-27 | 7010 S Maplewood Ave | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 3.8 KW. ARRAY OUT |
| 2026-10-27 | 8117 S Kildare Ave | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTP |
| 2026-10-27 | 4522 S Oakenwald Ave | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OU |
| 2026-10-27 | 7648 S Loomis Blvd | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OU |
| 2026-10-27 | 7735 W Bryn Mawr Ave | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTP |
| 2026-10-27 | 341 W 102Nd Pl | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OU |
| 2026-10-27 | 8146 S Princeton Ave | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 4.74 |
| 2026-10-26 | 7100 W 64Th St | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.44 KW. ARRAY O |
| 2026-10-26 | 5924 S Monitor Ave | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OU |
Addresses and work descriptions as published by the city. Owner names and phone numbers are removed.
Frequently Asked Questions
Do I need a solar panel permit in Chicago?
Yes. New small rooftop solar systems up to 13.44 kW inverter output can use Chicago's Express Permit Program, with drawings and calculations from an Illinois-licensed architect or structural engineer. Larger systems, roofs over 40 feet and some ballasted systems need a standard permit.
How many solar panel permits does Chicago issue?
Chicago issued 1,615 permits matching solar panel work between October 30, 2025 and October 30, 2026, about 135 a month. The busiest month was Aug 2026 with 212.
How much does a solar panel permit cost in Chicago?
We have not yet verified Chicago's fee for this work from an official fee schedule, so we do not quote one. The fee is set by the Chicago Department of Buildings when you apply. In the city's own records, the median fee paid on these permits over the last 12 months was $300.
How long does it take to get a solar panel permit in Chicago?
Based on the city's records, the median time from application to issue for these permits was 10 days over the last 12 months.
Who issues solar panel permits in Chicago?
The Chicago Department of Buildings.
Related Permit Guides
- Chicago Roofing Permits
- Chicago HVAC Permits
- Chicago Fence Permits
- New York Solar Panel Permits
- Austin Solar Panel Permits
- Solar Panel Permits by City
- Solar Panel Permit Rules for Homeowners
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- Chicago DOB Express Permit Program: Small-Scale Solar PV System (linked above) (chicago.gov)