City guide

NYC Work That May Not Need a DOB Permit (1 RCNY 101-14)

New York City publishes a rule listing minor work that may not need a Department of Buildings permit. It is narrower than many owners assume.

Updated 5 min read3 official sources

A white and brown wooden house among green trees
Photo: Unsplash. Illustrative only; it does not show a specific permitted project.

Key Takeaways

  • 1 RCNY §101-14 lists ordinary repairs and minor alterations that do not need a DOB permit in New York City.
  • Replacing roof coverings above the roof deck can be an ordinary repair; replacing the deck or sheathing needs a permit.
  • Packaged A/C units of 3 tons or less in an existing window or sleeve are exempt.
  • Solar installations need a licensed contractor and a Registered Design Professional.
  • Exempt work must still comply with the code, landmarks rules and building or co-op requirements.

Commonly Exempt Work

  • Replacing roof coverings, membrane and insulation above the roof deck, where the Energy Code does not require added insulation.
  • Packaged air-conditioning units of 3 tons or less in an existing window or sleeve.

Every Project Type in New York

These summaries come from the same official sources as our city pages and were last checked October 30, 2026. Permit counts are the city's own open-data records for the last 12 months.

Roofing: Sometimes

Under 1 RCNY §101-14, replacing roof coverings, membrane and insulation above the roof deck can be an ordinary repair that is exempt from a DOB permit, as long as the Energy Conservation Code does not require added insulation. Replacing the roof deck or sheathing requires a permit.

  • Roof covering replacement above the deck may be exempt (1 RCNY §101-14).
  • Replacing roof deck or sheathing requires a permit.
  • Landmarked buildings still need Landmarks Preservation Commission approval.
  • New York issued 6,622 matching permits in the last 12 months, with a median of 268 days from application to issue.

Source: 1 RCNY §101-14: Work that may or may not require a permit

HVAC: Usually Yes

Most heating and central air work needs a DOB permit. 1 RCNY §101-14 exempts a packaged air-conditioning unit of 3 tons or less installed in an existing window or sleeve, and some voluntary systems serving one floor that do not penetrate a roof, floor or fire-rated wall.

  • Exempt: packaged AC units up to 3 tons in existing windows or sleeves.
  • Exempt: voluntary AC/ventilation serving one floor with no lot-line openings or penetrations.
  • Gas and oil-burning equipment work requires licensed trades.
  • New York issued 4,485 matching permits in the last 12 months, with a median of 51 days from application to issue.

Source: 1 RCNY §101-14: Work that may or may not require a permit (linked above) · Full details: New York HVAC Permits

Solar Panel: Yes

No solar work can be done in New York City without a DOB work permit, a licensed contractor and a Registered Design Professional. Only solar landscape lights are exempt.

  • A DOB work permit is required for every solar energy system.
  • A licensed contractor and a Registered Design Professional are required.
  • Solar landscape lights are the only exemption.
  • New York issued 5,493 matching permits in the last 12 months, with a median of 5 days from application to issue.

Source: NYC DOB: Project Requirements for Owner – Solar System

ProjectPermit needed?Permits (12 mo)Median days to issue
roofingSometimes6,622268
HVACUsually yes4,48551
solar panelYes5,4935

Work That Still Needs a Permit

  • Replacing roof deck or sheathing.
  • Any solar installation (licensed contractor and Registered Design Professional required).
  • Most central heating and cooling work.

Landmarked buildings may also need Landmarks Preservation Commission approval.

New York City Permit Pages

See New York Roofing Permits, New York Solar Panel Permits and New York Building Permits.

Ordinary Repairs Versus Alterations

New York City distinguishes between ordinary repairs, which can be done without a permit, and alterations, which need one. The rule in 1 RCNY §101-14 is the city's version of an exemption list, similar in purpose to IRC R105.2 (see Work That Does Not Need a Building Permit: IRC R105.2 Exemptions). Work that affects structure, fire safety, egress, or the building's gas, plumbing or electrical systems generally falls outside ordinary repairs. Electrical and plumbing work in NYC is typically done by licensed trades who file their own permits.

Common Homeowner Projects in NYC

ProjectDOB permit?
Replace roof covering above the deckCan be an ordinary repair
Replace roof deck or sheathingPermit required
Packaged window or sleeve A/C, 3 tons or lessExempt
Central A/C or gas-fired equipmentPermit, filed by licensed professionals
Rooftop solarPermit; licensed contractor and Registered Design Professional

The DOB's "Do I Need a Permit?" page is the best place to confirm a specific project.

Landmarks, Co-Ops and Condos

In New York, a DOB exemption is rarely the only approval. Buildings in historic districts or individual landmarks may need Landmarks Preservation Commission approval for exterior work, and co-op and condo boards commonly require alteration agreements, insurance and licensed contractors even for permit-exempt work. Ask your managing agent before scheduling contractors.

Solar in New York City

The DOB's solar requirements page says solar installations need a licensed contractor and a Registered Design Professional. Rooftop access, setbacks and fire department rules also apply. See Solar Panel Permit Rules for Homeowners for how other cities handle solar.

Checking NYC Permit History

NYC publishes DOB NOW approved permits as open data, searchable by address. Before buying, look up the building's permit history and any open permits; How to Look Up Building Permits for a House explains how.

Before You Start Exempt Work

Even when work does not need a DOB permit, keep a record of what you did and why you relied on the exemption: the section of 1 RCNY §101-14, photos and invoices. Building managers, buyers and lenders may ask. If you are unsure, the DOB's guidance pages and licensed professionals can confirm whether work is an ordinary repair. For a model-code comparison, see Building Permit Inspections: What Inspectors Check and When for how permitted work is checked.

Who Issues Permits in New York

Residential permits in New York are issued by the NYC Department of Buildings. Its website has the current application portal, fee schedule and inspection scheduling. Issued permits are published as open data in DOB NOW: Build – Approved Permits, which is the source of the permit counts and recent permits shown on our New York pages. Rules and fees change, so confirm with the department before you start work.

Frequently Asked Questions

Do I need a permit for a window AC in NYC?

1 RCNY §101-14 exempts packaged units of 3 tons or less installed in an existing window or sleeve.

Do I need a permit to replace my roof in NYC?

Replacing roof coverings above the roof deck can be an ordinary repair under 1 RCNY §101-14, but replacing the deck or sheathing requires a permit.

Does a window air conditioner need a permit in NYC?

A packaged unit of 3 tons or less in an existing window or sleeve is exempt.

Written and maintained by the Home Permit Guide Editorial TeamPlaceholder profile

Last updated

This is a placeholder editorial profile. A named reviewer with verifiable experience will be added here. Until then, every rule on this page links to the official government source it was checked against. Read our editorial policy.

Sources

Official sources checked on . Rules change; confirm with the department before you start work.

  1. 1 RCNY §101-14 (NYC Rules) (linked above) (codelibrary.amlegal.com)
  2. NYC DOB: Do I Need a Permit? (nyc.gov)
  3. NYC DOB: Project Requirements for Owner – Solar (linked above) (nyc.gov)